Knowledge Portal · engineering documentation

Skip to content

ADR-004: Adapter Architecture

Status: Accepted
Date: 2026-06-28
Last updated: 2026-07-05


Decision

Adapters implement contracts at the boundary between platform and consumer (IDE, product module, federation). Core and contracts remain adapter-independent.


Breadcrumbs: Home → ADR → ADR-004

ZAIXOS Knowledge Portal — public engineering docs at /docs · Staff operations at /admin