Status: Permanent execution authority — planning only for 12-5–12-9


Purpose

Plan execution of Phases 12-5 through 12-9 without performing implementation in Phase 12-4.

Each phase: objective, inputs, outputs, gates, rollback, Format B report required.


Migration timeline (summary)

PhaseTitleDuration estimateDepends on
12-5Repository Scaffold1 phase12-4 complete
12-6Platform Extraction2–4 phases (waves)12-5
12-7Consumer Migration1–2 phases12-6 rc.final
12-8Platform Validation1 phase12-7
12-9Platform GA Freeze1 phase12-8

Estimates are planning guides — not schedule commitments.


Phase 12-5 — Repository Scaffold

Objective

Create empty zaixos-engineering-platform repository matching REPOSITORY_LAYOUT_PLAN.md.

Inputs

  • Layout plan
  • Package architecture
  • PRE-* baseline from Dental Clinic

Outputs

  • Empty directory tree
  • composer.json skeleton
  • phpunit.xml.dist
  • CI workflow stubs (no tests yet)
  • README pointing to planning docs

Gates (SC-*)

All VALIDATION_PLAN.md SC-1–SC-5.

Rollback

ROLLBACK_PLAN.md RB-12-5.

Explicitly NOT in 12-5

  • Asset copy from Dental Clinic
  • Packagist publish
  • Product composer changes

Phase 12-6 — Platform Extraction

Objective

Copy all platform assets to platform repo per EXTRACTION_SEQUENCE.md waves W1–W8.

Inputs

Outputs

  • Platform repo with full content
  • 1.0.0-rc.final candidate
  • Platform CI green (EX-W6)
  • Updated adapter manifest.json paths per PACKAGE_SPLIT_PLAN.md

Wave execution order

W1 → W2 → W3 → W4 → W5 → W6 → W7 → W8 (strict).

Gates

EX-W1 through EX-W8 per VALIDATION_PLAN.md.

Rollback

RB-12-6 — Dental Clinic untouched.

Explicitly NOT in 12-6

  • Dental Clinic composer require
  • Embedded deletion
  • contract obligation changes

Phase 12-7 — Consumer Migration

Objective

Dental Clinic becomes platform consumer #1 per CONSUMER_INTEGRATION_PLAN.md.

Inputs

Outputs

  • composer.json require
  • .zaixos/platform.yml, platform.lock
  • Materialized adapter + .cursor/ mount
  • Product CI wired to vendor validation tests
  • Dual-run state (embedded + vendored)

Gates

CO-1 through CO-6 per validation plan.

Rollback

RB-12-7 — restore embedded authoritative mode.

Explicitly NOT in 12-7

  • Remove embedded ERP docs
  • Platform GA tag
  • Packagist public GA (rc publish OK)

Phase 12-8 — Platform Validation

Objective

Prove parity, consumer correctness, and compatibility per VALIDATION_PLAN.md PV-*.

Inputs

  • 12-7 dual-run state
  • Baseline checksums RP-0, RP-3

Outputs

  • Signed validation report (Format B)
  • Architect acceptance for GA readiness
  • No version bump unless fixes require rc bump

Gates

PV-1 through PV-8 + KPI measurements.

Rollback

RB-12-8 — return to 12-7 fix forward or RB-12-7.

Explicitly NOT in 12-8

  • Embedded deletion
  • Platform 1.0.0 GA tag (prepare only)

Phase 12-9 — Platform GA Freeze

Objective

Release zaixos-platform@v1.0.0; sunset embedded copies; declare ZEP GA.

Inputs

Outputs

  • Platform tag zaixos-platform@v1.0.0
  • Packagist publish
  • Embedded ERP removed from Dental Clinic (stub README)
  • Product platform.lock @ 1.0.0 exact
  • KPI-10 = 0
  • Phase Format B + Architect RESPONSE_TEMPLATE

Gates

GA-1 through GA-5 per validation plan.

Rollback

RB-12-9 (within support window) — requires RP-0 archive.

Git freeze

Developer executes per GIT_FREEZE_PROCEDURE — platform repo tag + product release doc.


Cross-phase documentation requirements

Each phase MUST produce:

DeliverableFormat
Phase reportFormat B
Updated restore pointRP-* ID
Validation evidenceTest output / checksum
Architect acceptanceRESPONSE_TEMPLATE (12-7, 12-8, 12-9)

Decision freeze

Phase 12-4 finalizes all planning decisions required for 12-5:

  • Repository name: zaixos-engineering-platform
  • Package name: zaixos/engineering-platform
  • Extraction waves W1–W8 order
  • Consumer #1: Dental Clinic ROS
  • GA version: 1.0.0 / contracts@1
  • No additional planning artifacts required before 12-5

Implementation Phase Plan v1.0 — Phase 12-4.